歡迎訪(fǎng)問濟南(nán)快狗视频(qiáng)模具有限公司!

當前位置:首頁-新聞中心-公司新聞模具原料和製(zhì)造(zào)時的注塑周期有聯係(xì)嗎?

模具原料和(hé)製造時的注塑周期有聯係嗎?

來源:http://www.lsjtcyjt.cn/ 日期:2022-04-18

  大家應該都清楚,模具製(zhì)造加工時的原(yuán)料對於整個產品製造工程來講是起(qǐ)到了一個非常重要的作用,所以關於原料的各個方麵的工作都要做好才是,那麽有人就想來了解一個問題--模具原料和(hé)製造時的注塑周期(qī)有聯係嗎(ma)?當然是有的!下麵來分析下。
  We should all know that the raw materials of mold manufacturing and processing play a very important role in the whole product manufacturing engineering, so all aspects of the work of raw materials should be done well. Then someone wants to know a question -- is there a connection between mold raw materials and the injection molding cycle of manufacturing? Of course there is! So let's analyze it.
  在加工注塑(sù)模具時,要提(tí)高(gāo)節約原材料(liào)的意識,加強原材料的把控,提高每(měi)個員工的工作質量和責任心,全方位減少原材料的浪費。注塑生產,為(wéi)企業創造更多利潤。山東模具製造廠家的注塑(sù)周期時間越短,在保證產品質量的前提下越好。注塑周期越短,產量越高(gāo),單位(wèi)產品的製造成本就越低。
  In the processing of injection molds, we should improve the consciousness of saving raw materials, strengthen the control of raw materials, improve the work quality and responsibility of each employee, and reduce the waste of raw materials in an all-round way. Injection molding production, for enterprises to create more profits. The shorter the injection cycle time of Shandong mold factory is, the better the product quality is guaranteed. The shorter the injection cycle, the higher the yield, the lower the manufacturing cost per unit of product.
  注塑循環時間包括注塑時間、保壓時間(jiān)、冷(lěng)卻時間、打開時間、頂出時間、打開時間、回料時間、合模時間、合(hé)模(mó)時間等,包括注(zhù)塑(sù)台前進/後退時間和(hé)注塑脫模(mó)時間。在模具注塑廠,縮短注塑周(zhōu)期時間的主要方法有:減小塑料壁厚/通道尺寸(減少冷卻時(shí)間)、減小開合模距(jù)離/頂出杆行程(chéng)、產品快速取出(chū)、機器人操作,提高安全門開/關速度,減少(shǎo)膠粘現象,正確(què)選擇冷(lěng)卻時間(jiān),設(shè)置開/合模速度等。
  The injection cycle time includes injection time, holding time, cooling time, opening time, ejection time, opening time, material return time, mold closing time, mold closing time, etc., including the injection bench forward/backward time and injection demoulding time. In plastic injection mould factory, shorten the molding cycle time of the main methods are: to decrease the size of the plastic wall thickness/channel, reduce the cooling time, reduce the distance/ejection rod stroke, combining a model products, robot quickly after the operation, improve the security door open/close speed, reduce the adhesion phenomenon, correct selection of cooling time, set the opening/closing speed, etc.
  縮短(duǎn)注塑周期時間的一(yī)些重要的方法:減小塑(sù)件壁厚/流道尺(chǐ)寸、減小開合(hé)距(jù)離/頂針行程、快速取(qǔ)出產品、機械手操(cāo)作、加快開合速度安(ān)全門,減少塑料件的粘連。模具現象,正確選擇冷卻時(shí)間,合理設置開合模速度和頂針速度/次數等。縮短注(zhù)射周期時間提高生產率。
  Some important methods to shorten the injection cycle time: reduce the wall thickness/runner size of plastic parts, reduce the opening and closing distance/thimble stroke, quickly take out the product, manipulator operation, speed up the opening and closing speed safety door, reduce the adhesion of plastic parts. Mold phenomenon, correct selection of cooling time, reasonable setting of mold opening and closing speed and thimble speed/times. Shorten injection cycle time to improve productivity.
  模具原料和製(zhì)造時的注(zhù)塑周期有聯係嗎?關於這個問題您看完上述講解應該已經有了解了,所以在進行模具的加工製(zhì)造時應該要好好的做一些準備措施才行。更多內容(róng)的了解,您可以來我們網站www.lsjtcyjt.cn谘詢,客(kè)服人員二十四小時(shí)等待您!
  Is there a connection between the mold material and the injection cycle at the time of manufacture? You should have an understanding of this problem after reading the above explanation, so in the processing and manufacturing of the mold should be good to do some preparatory measures. For more information, you can come to our website www.lsjtcyjt.cn for consultation, customer service staff waiting for you 24 hours!

相關產品 / Related products

濟南快狗视频模具(jù)有限公司

魯ICP備(bèi)15002024號-2

網站地圖    TXT    XML 魯公網安備 37010502002026號
快狗视频-快狗视频下载免费版-快狗视频最新版app下载-快狗视频app官方下载