濟南(nán)注塑加工技術人員指出,注塑模具加工中上下模有三大要點:一、上模的準備工作;二、上(shàng)模步驟;三、下模的準備工作。
Jinan injection molding technicians pointed out that there are three key points in injection mold processing: first, the preparation of the upper mold; 2、 Upper mold steps; 3、 Preparation for lower mold.
上模的準備工作
Preparation of upper mold
1)先檢查料是否以烘上,如(rú)沒烘必須先烘料。
1) First check whether the material is baked. If not, the material must be dried first.
2)檢查機器是否是空著,機器的尺寸是否合適,頂出是(shì)否合適,要求的特殊(shū)功能(néng)是否有,如果有一點達不到將立(lì)刻匯報等待通知。
2) Check whether the machine is empty, whether the size of the machine is appropriate, whether the ejection is appropriate, and whether the required special functions are available. If one point is not met, it will be reported immediately for notification.
3)檢查模具是否已經好了,如果沒好將立刻匯報等待通知。
3) Check whether the mold is ready. If not, report it immediately and wait for notice.
4)以上三點準備都好了將(jiāng)準備上模工具,水管和相應的設備。
4) When the above three points are ready, the upper mold tools, water pipes and corresponding equipment will be prepared.
上模步驟
Upper die steps
1)把模具拉到相應(yīng)的機(jī)台的(de)前麵放(fàng)穩擰上相(xiàng)應吊環並確認頂針。
1) Screw the corresponding thimble onto the corresponding die table.
2)用行車平(píng)穩的吊起模(mó)具慢慢的放(fàng)入機中對準機器和模具的定位(wèi)圈。
2) Lift the mold stably with the traveling crane and slowly put it into the machine to align the positioning ring of the machine and the mold.
3)慢速合模,把模具合(hé)緊。
3) Close the mold slowly and tightly.
4)用壓(yā)板把模具綁緊並(bìng)慢速(sù)鬆掉吊車和移走(zǒu)吊車,再次把抬鈀拿下。
4) Fasten the mold with the pressing plate, loosen the crane slowly and remove the crane, and take down the palladium again.
5)起高壓並(bìng)再次鎖緊螺絲並對射嘴。
5) Raise the high pressure and lock the screw again and align the nozzle.
6)先檢(jiǎn)查模具(jù)有無異常或要在開模前須(xū)的(de)設備,確認好後慢速開模。
6) First check whether the mold is abnormal or the equipment to be before mold opening, and then open the mold slowly after confirmation.
7)開模後再次檢查模具是否有異常。
7) After opening the mold, check whether the mold is abnormal again.
8)找相關的人員(yuán)接特殊(shū)的輔(fǔ)助設(shè)備並調試好。
8) Find relevant personnel to connect special auxiliary equipment and debug it.
9)根據要求裝上(shàng)輔助設備象:水,強拉,熱流道等並實驗這些輔助設備是否正常。
9) Install auxiliary equipment as required, such as water, forced pull, hot runner, etc., and test whether these auxiliary equipment are normal.

10)準備開機。
10) Ready to power on.
下模的準備工作(zuò)
Preparation for lower formwork
1)停掉注塑,把(bǎ)螺杆的殘料射出用PP料清洗螺杆。
1) Stop the injection molding, inject the residual material of the screw, and clean the screw with PP material.
2)關閉相應水:普通水和模溫(wēn)機(jī)的(de)水。
2) Turn off the corresponding water: ordinary water and water of mold temperature machine.
3)準備都好(hǎo)了將準備下模工具和(hé)相應(yīng)的設(shè)備:水桶,風槍,防鏽油,吊環,吊車等。
3) When all preparations are ready, tools and corresponding equipment will be prepared: bucket, air gun, antirust oil, lifting ring, crane, etc.
4)找相應的部門拆掉在下模前要拆的設備。
4) Find the corresponding department to remove the equipment to be removed before mold removal.